    Multi-objective mathematical model based on fuzzy hybrid multi-criteria decision-making and FMEA approach for the risks of oil and gas projects
    (Emerald, 2020-10-28)
    Purpose: The purpose of this study is to provide a comprehensive framework for analyzing risk factors in oil and gas projects. Design/methodology/approach: This paper consists of several sections. In the first section, 19 common potential risks in the projects of Pars Oil and Gas Company were finalized in six groups using the Lawshe validation method. These factors were identified through previous literature review and interviews with experts. Then, using the “best-worst multi-criteria decision-making” method, the study measured the weights associated with the performance evaluation indicators of each risk. Consequently, failure mode and effects analysis (FMEA) and the grey relational analysis (GRA)-VIKOR mixed method were used to rank and determine the critical risks. Finally, to assign response strategies to each critical risk, a zero-one multi-objective mathematical programming model was proposed and developed Epsilon-constraint method was used to solve it. Findings: Given the typical constraints of projects which are time, cost and quality, of the projects that companies are often faced with, this study presents the identified risks of oil and gas projects to the managers of the oil and gas company in accordance with the priority given in the present research and the response to each risk is also suggested to be used by managers based on their organizational circumstances. Originality/value: This study aims at qualitative management of cost risks of oil and gas projects (case study of Pars Oil and Gas Company) by combining FMEA, best worst and GRA-VIKOR methods under fuzzy environment and Epsilon constraints. According to studies carried out in previous studies, the simultaneous management of quantitative and qualitative cost of risk of oil and gas projects in Iran has not been carried out and the combination of these methods has also been innovated.
  • Some of the metrics are blocked by your 
    Item type:Publication,
    Hybrid fuzzy MCDM and FMEA integrating with linear programming approach for the health and safety executive risks: a case study
    (Emerald, 2021-03-01)
    The of this study is to present a new failure mode and effects analysis (FMEA) approach based on fuzzy multi-criteria decision-making (MCDM) methods and multi-objective programming model for risk assessment in the planning phase of the oil and gas construction projects (OGCP) in Iran. Design/methodology/approach This research contains multiple steps. First, 19 major potential health and safety executive (HSE) risks in OGCP were classified into six categories with the Delphi method. These factors were distinguished by the review of project documentation, checklist analysis and consulting with experts. Then, using the fuzzy SWARA method, the authors calculated the weights of major HSE risks. Subsequently, FMEA and PROMETHEE approaches were used to identify the priority of main risk factors. Eventually, a binary multi-objective linear programming approach was developed to select the risk response strategies, and an augmented e-constraint method (AECM) was used. Findings Regarding the project triple well-known constraints of time, cost and quality, which organizations usually confront, the HSE risks of OGCP were identified and prioritized. Also, the appropriate risk response strategies were also suggested to the managers to be adopted regarding the situations. Originality/value The present research points at the HSE risks’ assessment integrating the fuzzy FMEA, step-wise weight assessment ratio analysis and PROMETHEE techniques with the AECM. Further to the authors’ knowledge, the quantitative assessment of the HSE risks of OGCP has not been done using the combination of the fuzzy FMEA, MCDM and AECMs.