    A genetic algorithm-based method for solving multi-mode resource-constrained project scheduling problem in uncertain environment
    (Growing Science, 2020-01-01)
    Project scheduling models with resource constraints and multi-mode activities aims to create a schedule for carrying out activities considering precedence constraints and available resources in order to minimize the project duration. In the real world, we face uncertainty related to projects, where there are no historical data, hence, we should rely on the experts' judgements to estimate activity durations. For this purpose, in this paper, the 99-simulation method is used to deal with uncertainty. The exact mathematical programming model is presented in this paper and the hybrid algorithm based on Genetic Algorithm is used to solve this type of project scheduling problem which finds the near-optimal solution in a short computational time. Finally, the effectiveness of the proposed model is examined with a numerical example.
  • Some of the metrics are blocked by your 
    Item type:Publication,
    Analysis of factors affecting project communications with a hybrid DEMATEL-ISM approach (A case study in Iran)
    (Elsevier, 2020-08-01)
    Project management; Communications management; Fuzzy DEMATEL; Interpretive structural modeling (ISM); MICMAC Analysis; Construction engineering; Human resource management; Industry management; Business management; Behavioral psychology; Business One of the main factors in the success of projects is communications management and proper and timely distribution of information among all internal and external project stakeholders. Despite of emphasizing on the importance of project communications in the literature, there are few studies identifying factors influencing project communications. This research aims to address this shortcoming by identifying and determining sequences and relationships factors affecting project communications and their clustering. The informed communication strategy allows managers to structure the information flow in a better and more controlled manner and to avoid the costs caused by lack of effective and timely communication. The present study is conducted to help clarify the views of the organization's managers and project managers on project communications, and to identify factors affecting it and how they effectively communicate to successfully accomplish the projects. First a number of factors influencing project communications are identified on the basis of previous studies and interviews with experts and project managers working in oil, gas and power plant construction megaprojects in Iran. Then, these factors are analyzed by using the combination of fuzzy DEMATEL and Interpretive Structural Modeling (ISM) techniques. The relationships and sequence between the indicators are determined so that it can be effective in project communications planning and project success through providing an insight for senior managers and project managers.
  • Some of the metrics are blocked by your 
    Item type:Publication,
    A project buffer and resource management model in energy sector; a case study in construction of a wind farm project
    (Emerald, 2020-10-06)
    Purpose: This study aims to introduce an efficient project buffer and resource management (PBRM) model for project resource leveling and project buffer sizing and controlling of project buffer consumption of a wind power plant project to achieve a more realistic project duration. Design/methodology/approach: The methodology of this research consists of three main phases. In the first phase of the research methodology, resource leveling is done in the project and resource conflicts of activities are identified. In the second phase, the project critical chain is determined, and the appropriate size of the project buffer is specified. In the third phase of the methodology, buffer consumption is controlled and monitored during the project implementation. After using the PBRM method, the results of this project were compared with those of the previous projects. Findings: According to the obtained results, it can be concluded that using PBRM model in this wind turbine project construction, the project duration became 25 per cent shorter than the scheduled duration and also 29 per cent shorter than average duration of previous similar projects. Research limitations/implications: One of the major problems with projects is that they are not completed according to schedule, and this creates time delays and losses in the implementation of projects. Today, as projects in the energy sector, especially renewable projects, are on the increase and also we are facing resource constraint in the implementation of projects, using scheduling techniques to minimize delays and obtain more realistic project duration is necessary. Practical implications: This research was carried out in a wind farm project. In spite of the initial plan duration of 142 days and average duration of previous similar projects of 146 days, the project was completed in 113 days. Originality/value: This paper introduces a practical project buffer and resource management model for project resource leveling, project buffer sizing and buffer consumption monitoring to reach a more realistic schedule in energy sector. This study adds to the literature by proposing the PBRM model in renewable energy sector.
  • Some of the metrics are blocked by your 
    Item type:Publication,
    The multi-objective supplier selection problem with fuzzy parameters and solving the order allocation problem with coverage
    (Emerald, 2020-08-04)
    Purpose: This study aims to deal with supplier selection problem. The supplier selection problem has significantly become attractive to researchers and practitioners in recent years. Many real-world supply chain problems are assumed as multiple objectives combinatorial optimization problems. Design/methodology/approach: In this paper, the authors propose a multi-objective model with fuzzy parameters to select suppliers and allocate orders considering multiple periods, multiple resources, multiple products and two-echelon supply chain. The objective functions consist of total purchase costs, transportation, order and on-time delivery, coverage and the weights of suppliers. Distance-based partial and general coverage of suppliers makes the number of orders of products more realistic. In this model, the weights of suppliers are determined by fuzzy Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) method, as a multi-criteria decision analysis method, in the objective function. Also, the authors consider the parameters related to delays as triangular fuzzy numbers. Findings: A small-sized numerical example is provided to clearly show the proposed model. The exact epsilon constraint method is used to solve this given multi-objective combinatorial optimization problem. Subsequently, the sensitivity analysis is conducted to testify the proposed model. The obtained results demonstrate the validity of the proposed multiple objectives mixed integer mathematical programming model and the efficiency of the solution approach. Originality/value: In real-life situations, supplier selection parameters are uncertain and incomplete. Hence, the fuzzy set theory is used to tackle uncertainty. In this paper, a multi-objective supplier selection problem is formulated taking into consideration the coverage of suppliers and suppliers’ weights. Integrating coverage of suppliers to select and allocate the order to them can be mentioned as the main contribution of this study. The proposed model considers the delay from suppliers as fuzzy parameters.
  • Some of the metrics are blocked by your 
    Item type:Publication,
    A hub location model in the sustainable supply chain considering customer segmentation
    (Emerald, 2020-12-30)
    Purpose This paper aims to study the hub transportation system in supply chain networks which would contribute to reducing costs and environmental pollution, as well as to economic development and social responsibility. As not all customers tend to buy green products, several customer groups should be considered in terms of need type. Design/methodology/approach In this paper, a multi-objective hub location problem is developed for designing a sustainable supply chain network based on customer segmentation. It deals with the aspects of economic (cost reduction), environment (minimizing greenhouse gas emissions by the transport sector) and social responsibility (creating employment and community development). The epsilon-constraint method and augmented epsilon-constraint (AEC) method are used to solve the small-sized instances of this multi-objective problem. Due to the non-deterministic polynomial-time hardness of this problem, two non-dominated sorting genetic algorithm-II (NSGA-II) and multi-objective grey wolf optimizer (MOGWO) metaheuristic algorithms are also applied to tackle the large-sized instances of this problem. Findings As expected, the AEC method is able to provide better Pareto solutions according to the goals of the decision-makers. The Taguchi method was used for setting the parameters of the two metaheuristic algorithms. Considering the meaningful difference, the MOGWO algorithm outperforms the NSGA-II algorithm according to the rate of achievement to two objectives simultaneously and the spread of non-dominance solutions indexes. Regarding the other indexes, there was no meaningful difference between the performance of the two algorithms. Practical implications The model of this research provides a comprehensive solution for supply chain companies that want to achieve a rational balance between the three aspects of sustainability. Originality/value The importance of considering customer diversity on the one hand and saving on hub transportation costs, on the other hand, triggered us to propose a hub location model for designing a sustainable supply chain network based on customer segmentation.
  • Some of the metrics are blocked by your 
    Item type:Publication,
    Multi-objective mathematical model based on fuzzy hybrid multi-criteria decision-making and FMEA approach for the risks of oil and gas projects
    (Emerald, 2020-10-28)
    Purpose: The purpose of this study is to provide a comprehensive framework for analyzing risk factors in oil and gas projects. Design/methodology/approach: This paper consists of several sections. In the first section, 19 common potential risks in the projects of Pars Oil and Gas Company were finalized in six groups using the Lawshe validation method. These factors were identified through previous literature review and interviews with experts. Then, using the “best-worst multi-criteria decision-making” method, the study measured the weights associated with the performance evaluation indicators of each risk. Consequently, failure mode and effects analysis (FMEA) and the grey relational analysis (GRA)-VIKOR mixed method were used to rank and determine the critical risks. Finally, to assign response strategies to each critical risk, a zero-one multi-objective mathematical programming model was proposed and developed Epsilon-constraint method was used to solve it. Findings: Given the typical constraints of projects which are time, cost and quality, of the projects that companies are often faced with, this study presents the identified risks of oil and gas projects to the managers of the oil and gas company in accordance with the priority given in the present research and the response to each risk is also suggested to be used by managers based on their organizational circumstances. Originality/value: This study aims at qualitative management of cost risks of oil and gas projects (case study of Pars Oil and Gas Company) by combining FMEA, best worst and GRA-VIKOR methods under fuzzy environment and Epsilon constraints. According to studies carried out in previous studies, the simultaneous management of quantitative and qualitative cost of risk of oil and gas projects in Iran has not been carried out and the combination of these methods has also been innovated.
  • Some of the metrics are blocked by your 
    Item type:Publication,
    A new approach for ranking efficient DMUs with data envelopment analysis
    (Emerald, 2020-07-02)
    Purpose: Classical models of data envelopment analysis (DEA) calculate the efficiency of decision-making units do not differentiate between efficient units. The purpose of this paper is to present a new method for ranking efficient units and compare it with the other methods presented in this field. Design/methodology/approach: In this paper, a new method is presented for ranking efficient units. To validate the proposed method, a real case, which was studied by Li et al. (2016) is examined and the rankings of the efficient units are compared with four other methods including the Andersen and Petersen’s super-efficiency, game theory and the concept of Shapley value and the technique for order of preference by similarity to ideal solution methods. Findings: The results show that there is a high correlation between the rankings of efficient units obtained by the new proposed method and the other methods such as Andersen and Petersen’s super-efficiency, game theory and Shapley value methods. Originality/value: The problem of ranking efficient units with the DEA method is an important issue for researchers. Extensive studies have been proposed to provide methods for ranking efficient units. This paper proposes a simple and fast method for ranking efficient units that achieves better results.
  • Some of the metrics are blocked by your 
    Item type:Publication,
    Risk identification and prioritization in banking projects of payment service provider companies: an empirical study
    (Springer, 2020-12-01)
    Abstract Identifying risks and prioritizing is important for payment service provider (PSP) companies to get banking projects and gain more market share. However, studies regarding the identification of risks and causal relationships are insufficient in the Iranian PSP industry and the industry is unique because of its characteristics. In this study, 30 experts involved with PSP companies are employed as the research sample. Eleven key risks and Forty-six sub-risks are also identified. Subsequently, the fuzzy decision-making trial and evaluation laboratory technique is applied to determine the effective and affected risks and the severity of their effects on each other. Finally, all risks are ranked. Due to the internal interrelationships of the main risks, the weight of each risk is calculated via the fuzzy analytic network process. As the second-level risks have no significant interrelationships, they are ranked via the fuzzy analytical hierarchy process. Moreover, the best-worst method is used to ensure that the obtained rankings are reliable. This study identifies the risks affecting the loss of banking projects and determines the impacts of these risks on each. A sensitivity analysis is then conducted on the weights of the criteria, and the results are compared.
  • Some of the metrics are blocked by your 
    Item type:Publication,
    What do project managers need to know to succeed in face-to-face communication?
    (Taylor & Francis, 2020-10-15)
    Despite emphasising the great importance of project communications to enhance success in the literature, there are few studies underlining the application of psychology to project communications, and no studies regarding the identification and analysis of factors affecting face-to-face communications with stakeholders in different situations. The research here aims to fundamentally address this shortcoming. The factors affecting face-to-face communications and different communication situations have been identified by interview with several experts in psychology and project managers working in oil and gas megaprojects. The data have been analysed by using two questionnaires and the hybrid Fuzzy DEMATEL-ISM and BWM methods. The final results show that the importance of each of these effective factors in face-to-face communication varies in different situations, and that some of these factors influence each other and some are influenced by one or another. Proxima has the greatest influence on other factors. Also, body language has great influence on other factors. The results of the current study could still serve as a reflection of what might be expected at a more general level for face-to-face communications to support good communications planning. The Video Neuro advertising Recommender System improved by applying the obtained research results.
  • Some of the metrics are blocked by your 
    Item type:Publication,
    Reliability computation for an uncertain PVC window production system using a modified bayesian estimation
    (IOS Press, 2020-10-06)
    Nowadays, Industries have been receiving much attention in Failure modelling and reliability assessment of repairable systems due to the fact that it plays a crucial role in risk and safety management of process. The primary purpose of this article is to present a methodology for discussing uncertainty in the reliability assessment if the production system. In fact, we discuss the fuzzy E-Bayesian estimation of reliability for PVC window production system. This approach is used to create the fuzzy E-Bayesian estimations of system reliability by introducing and applying a theorem called “Resolution Identity” for fuzzy sets. To be more specific, the model parameters are assumed to be fuzzy random variables. For this purpose, the original problem is transformed into a nonlinear programming problem which is divided into four sub-problems to simplify the computations. Finally, the results obtained for the sub-problems can be used to determine the membership functions of the fuzzy E-Bayesian estimation of system reliability. To clarify the proposed model, a practical example for PVC window production system is conducted.